Customization: | Available |
---|---|
Application: | Electronics Manufacturing, Food Processing, Industrial Automation Equipment, Medical Equipment, Office Furniture, Packaging Machinery, Storage Systems, Transportation Systems |
Carrying Capacity: | Middle-Level |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Aluminum linear guides are linear guides, but the accuracy is lower than ball linear guides and roller linear guides, and the price is cheap. This linear guide is cylindrical, the slider is bearing type, very easy to disassemble and install.
The slide block and base of aluminum linear guide are usually made of aluminum alloy, and the surface of the guide rail is chromium-plated, which is more friction-resistant and extends the service life.
Brand | SHUNTAI |
Model | TBR |
Size customize | 16,20,25,30 |
Style | With Flange or not ,butt Joint Process. |
Packing | Plastic bag+Wooden case packing |
Delivery time | 7days |
Applications | CNC machines, Printing Machine ,Paper-processing machine Machine tool, Solar energy equipment, Medical equipment, General industry machinery. Parking system |
The sliders can be sold separately, and the rails can be cut or spliced to length according to your needs
1. Why choose Suntai?
With more than 20 years of production experience, it is China's high-quality ball screw manufacturing base
2. Do you have a minimum order quantity requirement?
No, just one. More is better
3. What are your main products?
Ball screw, linear guide, ball spline and parts processing
4. How to customize (OEM/ODM)?
Send drawings or custom requirements to us
5. When can I get the quotation?
We usually make a quotation within one hour of receiving your inquiry. If it is a complex process, it may take a little longer, but our quotations usually do not exceed 12 hours
6. Can I have a sample?
Yes, but you need to pay for the sample
7. What are your terms of payment?
If the total price is less than $1000, 100% before production; If the total value exceeds $1000, 50% of the total value before production and 50% of the total value before delivery (specific percentages can be negotiated)