Customization: | Available |
---|---|
Application: | Electronics Manufacturing, Food Processing, Industrial Automation Equipment, Medical Equipment, Office Furniture, Packaging Machinery, Storage Systems, Transportation Systems |
Carrying Capacity: | Middle-Level |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The rolling arc guide rail is developed on the basis of HSUNTAI precision ball linear guide rail. Inheriting the advantages of SHUNTAI ball linear guides, circular or circular motion of any diameter can be achieved, overcoming the size limitations caused by machining with bearings or rolling supports. In theory, the larger the diameter of the STY arc guide rail, the more convenient the design, manufacture, installation and maintenance. And because of the unique structural design of STY, no gap and no overload can be achieved.
Brand | SHUNTAI |
Model | STY |
Size customize | 16-65 |
Style | With Flange or not ,butt Joint Process. |
Packing | Plastic bag+Wooden case packing |
Delivery time | 7-15days |
Applications | Electronics Manufacturing, Food Processing, Industrial Automation Equipment, Medical Equipment, Packaging Machinery |
The sliders can be sold separately, and the rails can be cut or spliced to length according to your needs
1. Why choose Suntai?
With more than 20 years of production experience, it is China's high-quality ball screw manufacturing base
2. Do you have a minimum order quantity requirement?
No, just one. More is better
3. What are your main products?
Ball screw, linear guide, ball spline and parts processing
4. How to customize (OEM/ODM)?
Send drawings or custom requirements to us
5. When can I get the quotation?
We usually make a quotation within one hour of receiving your inquiry. If it is a complex process, it may take a little longer, but our quotations usually do not exceed 12 hours
6. Can I have a sample?
Yes, but you need to pay for the sample
7. What are your terms of payment?
If the total price is less than $1000, 100% before production; If the total value exceeds $1000, 50% of the total value before production and 50% of the total value before delivery (specific percentages can be negotiated)